(peculiar) Spec Electronics/aircraft/(e2c) Parts

End item NSN parts
Filter By: Power Supplys
page 1 of 2
Part Number
NSN
NIIN
10386 Power Supply
004707554
10464 Power Supply
000030546
121236-1 Power Supply
000055536
121236-2 Power Supply
000055536
121236-3 Power Supply
010152282
123208-2 Power Supply
000041239
123SCAV5124-7 Power Supply
010450002
123SCAV5168-1 Power Supply
000055536
123SCAV5168-3 Power Supply
000055536
123SCAV5168-5 Power Supply
010152282
123SCSA606-1 Power Supply
005204349
123SCSA606-13 Power Supply
005204363
123SCSA606-3 Power Supply
005204350
123SCSA606-5 Power Supply
005204351
270-0287-030 Power Supply
010162856
277000-1 Power Supply
014080384
278000-1 Power Supply
014080386
331082 Power Supply
004707554
331094-2 Power Supply
000030546
404641-000 Power Supply
014080384
Page: 1

(peculiar) Spec Electronics/aircraft/(e2c)

Picture of (peculiar) Spec Electronics/aircraft/(e2c)

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections. The Project Management Body of Knowledge (PMBOK 5) defines the work breakdown structure as a "A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables."

A work breakdown structure element may be a product, data, service, or any combination thereof. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. In a project or contract, the WBS is developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, subtasks, and work packages) which include all steps necessary to achieve the objective.

השווה עכשיו»
צלול | התחבא