(peculiar) Spec Electronics/aircraft/(e2c) Parts

(Page 3) End item NSN parts page 3 of 12
Part Number
NSN
NIIN
123AV52967-3 Electrical Power Cable Assembly
014110185
123AV52968-1 Electrical Power Cable Assembly
014110190
123AV52992-1 Electrical Power Cable Assembly
014110195
123AV53314-1 Power Distribution Panel
011898949
123AV53314-3 Power Distribution Panel
011898949
123AV53349-1 Aircraft Air Pressure Controller
000014479
123AV53357-5 Electrical-electronic Equi Panel
014322465
123AV53358-3 Digital Display Indicator
011569300
123AV54600-1 De-icer Control
007647873
123AV54602-1 Panel Assembly And Vapor Cycle P
000418078
123AV54612-1 Power Distribution Panel
000366386
123AV72201-3 Radio Frequency Cable Assembly
014086616
123AV72204-3 Radio Frequency Cable Assembly
014086613
123AV72205-1 Radio Frequency Cable Assembly
014086615
123AV72206-1 Radio Frequency Cable Assembly
014086618
123AV72208-1 Radio Frequency Cable Assembly
014124820
123AV72211-1 Radio Frequency Cable Assembly
014113381
123AV72213-1 Radio Frequency Cable Assembly
014120556
123AV72216-1 Radio Frequency Cable Assembly
014113379
123AV72220-1 Branched Wiring Harness
014089918
Page: 3

(peculiar) Spec Electronics/aircraft/(e2c)

Picture of (peculiar) Spec Electronics/aircraft/(e2c)

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections. The Project Management Body of Knowledge (PMBOK 5) defines the work breakdown structure as a "A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables."

A work breakdown structure element may be a product, data, service, or any combination thereof. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. In a project or contract, the WBS is developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, subtasks, and work packages) which include all steps necessary to achieve the objective.

השווה עכשיו»
צלול | התחבא