(peculiar) Spec Electronics/aircraft/(e2c) Parts

End item NSN parts
Filter By: Electrical Power Cable Assemblys
page 1 of 1
Part Number
NSN
NIIN
123AV52965-3 Electrical Power Cable Assembly
014110188
123AV52966-1 Electrical Power Cable Assembly
014110187
123AV52967-3 Electrical Power Cable Assembly
014110185
123AV52968-1 Electrical Power Cable Assembly
014110190
123AV52992-1 Electrical Power Cable Assembly
014110195
123SAV55155-1 Electrical Power Cable Assembly
013399118
123SCAV5272-5 Electrical Power Cable Assembly
010045548
12R7030 Electrical Power Cable Assembly
010045548
12R7030-1L7 Electrical Power Cable Assembly
010045548
7639894P18 Electrical Power Cable Assembly
010045548
Page:

(peculiar) Spec Electronics/aircraft/(e2c)

Picture of (peculiar) Spec Electronics/aircraft/(e2c)

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections. The Project Management Body of Knowledge (PMBOK 5) defines the work breakdown structure as a "A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables."

A work breakdown structure element may be a product, data, service, or any combination thereof. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. In a project or contract, the WBS is developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, subtasks, and work packages) which include all steps necessary to achieve the objective.

השווה עכשיו»
צלול | התחבא